Ibn Sina Road Bridge – Sharm El Sheikh

About the Project

The Ibn Sina Road Bridge is the first bridge to be constructed in Sharm El Sheikh and represents the first fully integrated bridge utilizing Keystone walls for ramp construction, along with four steel tunnels manufactured by the Polish company Viacon. This includes two tunnels with a capacity of four traffic lanes for the main road and two tunnels with a capacity of two traffic lanes for service roads

Project Info

OWNER: Military Engineers Authority

STRUCTURE CONSULTANT: Dr. Kamal Sharoubim Engineering Consulting Office

PROJECT DURATION: 18 months

Related projects

let's work together

Get a Quotation

    EXPLORE THE FEATURES​

    Get in touch
    with us today

    4 Dr. Khaled Teama St., Heliopolis, Cairo, Egypt
    Email: geos@geosegypt.com

    Phone: (+20) 01001181191
    Follow us on: